Data center
electrical construction.

PowerBoy Electrical Services builds the complete electrical scope for hyperscale, colocation, and edge data centers — medium-voltage distribution, paralleling switchgear, generator and UPS plants, busway, and white-space fit-out — self-performed across Texas and nationally, typically at $3.50–$6.50 per critical watt.

3.2M+ sq ft white space wired450+ MW installed19 halls energized on or ahead of schedule

What we self-perform

Self-performance is the difference between promising a date and controlling one. These scopes stay on our payroll:

  • Medium-voltage distribution to 35kV — substations, duct banks, terminations & splicing
  • Paralleling switchgear & generator plants — N, N+1, 2N topologies
  • UPS systems, battery plants & DC power
  • PDU, RPP & branch distribution to the rack
  • Busway & overhead cable tray at hyperscale quantities
  • White-space fit-out — containment power, in-row distribution
  • Structured cabling & controls rough-in coordination
  • Level 1–5 commissioning support & integrated systems testing

The critical power chain, end to end

Utility interconnection to the last whip. Dual sources, 2N paralleling, and UPS distribution engineered, installed, and commissioned by one contractor — one throat to choke on the schedule.

Why halls energize on schedule with us

A

Gear released months early

In-house engineering locks ratings and one-line topology before drawings finish, so 40–60 week switchgear lead times land inside your schedule, not behind it.

B

Prefabrication at scale

Whips, racks, tray assemblies, and skids built in our shop while the site is still concrete — field crews install instead of fabricate.

C

Commissioning without drama

We staff Cx support from Level 1 receipt through integrated systems testing, and our QA/QC documentation package is turnover-ready from day one.

D

National mobilization

Texas-based with the licensing, workforce planning, and travel crews to follow data center clients into any market.

Building a hall? Put us on the bid list.

Send the one-line and the schedule. A master electrician — not a salesperson — walks the scope with you, usually within one business day.